Construction layout

Formwork Support

Layout kept in step with your forming crew and pour schedule.

Wall formwork panels and reinforcing steel in a foundation

What this covers

On a fast forming cycle, layout can't be a once-a-week visit. We work to your pour schedule: setting wall and column lines, checking blockouts, embeds and box-outs, and re-establishing control on each new deck.

Coordinating directly with your superintendent and lead hands means conflicts between the architectural, structural and MEP drawings get caught before they're cast in.

Layout services do not replace licensed surveying. For construction use only.

What you get

  • Wall and column lines set for each pour
  • Blockouts, embeds and box-outs checked against the drawings
  • Control re-established on every new deck
  • Direct coordination with your superintendent and lead hands

Common questions

Frequently asked questions

Have drawings and a pour date?

Let’s get your layout sorted

Send the IFC set and your schedule — we’ll come back with scope, timing and a quote.