Services
Construction layout & excavation
Everything a forming crew needs to build on line and on grade. Set out from your IFC drawings and timed to your pour schedule.
- 01
GNSS RTK Layout
Satellite-positioned layout for footings, walls, piers and foundations.
Satellite-positioned layout for footings, walls, piers and foundations.
- 02
Excavation + Layout
Machine and operator coordinated to layout tolerances.
Machine and operator coordinated to layout tolerances.
- 03
As-Built Verification
Tolerance checks on completed formwork and pours.
Tolerance checks on completed formwork and pours.
- 04
Formwork Support
Layout kept in step with your forming crew and pour schedule.
Layout kept in step with your forming crew and pour schedule.
- 05
Layout Troubleshooting
On-site diagnosis of layout conflicts and drawing discrepancies.
On-site diagnosis of layout conflicts and drawing discrepancies.
On GTA sites since 2014
Over ten years of layout and digging on concrete forming jobs.
Works from your IFC set
Points come straight off the issued-for-construction drawings.
±5 mm typical
Horizontal, with GNSS RTK, checked against site control.
Works to your pour schedule
We show up when your crew needs marks, not when it suits us.
Drawings in. Marks on the ground.
Step 1
Send the drawings
IFC set, pour dates, site address. We check scope and access.
Step 2
Get a price
Clear scope and a number, usually back the next business day.
Step 3
We lay it out
Control first, then layout ahead of your forming crew, to your pour schedule.
Step 4
Check before the pour
Optional as-built check against the model, written up for your file.