Toronto & the Greater Toronto Area
Construction layout in Toronto & the GTA
Layout, excavation and as-built checks for concrete forming contractors. Warehouses, low-rise, podium slabs and condo foundations across the region.
Layout built for GTA sites
Tight lots, deep digs, fast forming cycles and odd geometry. GTA jobs don’t leave much room for layout mistakes.
We set out control and layout straight from your IFC model and hold ±5 mm typical horizontal accuracy with GNSS RTK. On congested sites where satellite coverage is limited, we re-establish layout from fixed site control without losing tolerance.
Layout services don’t replace licensed surveying. They’re for construction use, done alongside your forming crew and timed to your pour schedule.

What we do across the GTA
- 01
GNSS RTK Layout
Satellite-positioned layout for footings, walls, piers and foundations.
Satellite-positioned layout for footings, walls, piers and foundations.
- 02
Excavation + Layout
Machine and operator coordinated to layout tolerances.
Machine and operator coordinated to layout tolerances.
- 03
As-Built Verification
Tolerance checks on completed formwork and pours.
Tolerance checks on completed formwork and pours.
- 04
Formwork Support
Layout kept in step with your forming crew and pour schedule.
Layout kept in step with your forming crew and pour schedule.
- 05
Layout Troubleshooting
On-site diagnosis of layout conflicts and drawing discrepancies.
On-site diagnosis of layout conflicts and drawing discrepancies.
±5 mm typical horizontalOur own gear, on every job
We bring the equipment, so layout starts the day we show up. No waiting on a survey crew to come back.
- GNSS RTK rover
- Real-time satellite positioning. No line-of-sight setups across big, open footprints.
- Field computer
- Layout points loaded from your IFC model and checked in the field before anything gets marked.
- Site control
- Benchmarks set and re-checked as the job goes up, so every pour ties to the same datum.
On GTA sites since 2014
Over ten years of layout and digging on concrete forming jobs.
Works from your IFC set
Points come straight off the issued-for-construction drawings.
±5 mm typical
Horizontal, with GNSS RTK, checked against site control.
Works to your pour schedule
We show up when your crew needs marks, not when it suits us.
Cities we serve
Concrete forming and general contractors across Toronto and the surrounding region. Ask us to confirm coverage for your site.