
Construction layout & excavation / Toronto & the GTA
Construction layout
you can pour to.
We lay out footings, walls, pile caps and curved forms from your IFC drawings, dig to the marks, and check the work before the concrete truck shows up. For forming crews in Toronto and across the GTA.
- Method
- GNSS RTK
- Tolerance
- ±5 mm typ.
- On GTA sites since
- 2014
- Works from
- Your IFC set
On GTA sites since 2014
Over ten years of layout and digging on concrete forming jobs.
Works from your IFC set
Points come straight off the issued-for-construction drawings.
±5 mm typical
Horizontal, with GNSS RTK, checked against site control.
Works to your pour schedule
We show up when your crew needs marks, not when it suits us.
What we do
Layout, digging and checks for concrete forming jobs. One crew, from first control point to final pour.
- 01
GNSS RTK Layout
Satellite-positioned layout for footings, walls, piers and foundations.
Satellite-positioned layout for footings, walls, piers and foundations.
- 02
Excavation + Layout
Machine and operator coordinated to layout tolerances.
Machine and operator coordinated to layout tolerances.
- 03
As-Built Verification
Tolerance checks on completed formwork and pours.
Tolerance checks on completed formwork and pours.
- 04
Formwork Support
Layout kept in step with your forming crew and pour schedule.
Layout kept in step with your forming crew and pour schedule.
- 05
Layout Troubleshooting
On-site diagnosis of layout conflicts and drawing discrepancies.
On-site diagnosis of layout conflicts and drawing discrepancies.

We read the drawings before we dig
Plenty of outfits can move dirt. We read the IFC set, know what tolerance each pour can take, and work with your forming crew from the first layout to the last pour.
That’s how a clash between the architectural and structural drawings gets caught on the ground, not after the concrete is in.
The work we’re set up for
Warehouses, low-rise condos, podium slabs and deep foundations. Most of it for concrete forming contractors, year-round.

Foundations & pile caps

Slab & deck pours

Shored excavations

Warehouses & low-rise

Winter work

Curved & complex formwork

Site servicing & trenches
±5 mm typical horizontalOur own gear, on every job
We bring the equipment, so layout starts the day we show up. No waiting on a survey crew to come back.
- GNSS RTK rover
- Real-time satellite positioning. No line-of-sight setups across big, open footprints.
- Field computer
- Layout points loaded from your IFC model and checked in the field before anything gets marked.
- Site control
- Benchmarks set and re-checked as the job goes up, so every pour ties to the same datum.
Drawings in. Marks on the ground.
Step 1
Send the drawings
IFC set, pour dates, site address. We check scope and access.
Step 2
Get a price
Clear scope and a number, usually back the next business day.
Step 3
We lay it out
Control first, then layout ahead of your forming crew, to your pour schedule.
Step 4
Check before the pour
Optional as-built check against the model, written up for your file.
Where we work
Toronto and the GTA, Hamilton to Pickering. Not sure we cover your site? Give us a call.



